Meaning
One time engineering expenses cover the design and fabrication of custom molds and dies required for high volume production. Procurement of initial tooling nre represents a fixed cost that is typically separated from the unit price of the manufactured component. This expenditure is required before the first production part can be validated.
The scope includes all hardware needed for casting or stamping.
Cost Amortization
Financial models often spread the expense across the total projected volume of the contract to determine the long term impact on profitability. High initial tooling nre costs require a large production run to remain economically viable compared to prototyping methods.
Design Lock
Approval of the final engineering drawings must occur before the commencement of tool fabrication. Any changes after the payment of initial tooling nre result in delays and additional modification fees.
Lifecycle Impact
Quality of the permanent tools determines the dimensional accuracy and surface finish of the parts over several years of use. Maintenance of the equipment purchased through initial tooling nre is usually the responsibility of the tier one supplier. Hardened steel inserts are often specified to extend the life of the mold beyond the initial five year production cycle.
Regular inspections ensure that wear does not result in parts that fall outside the agreed tolerances for the project.