Meaning
Pre-shipment verification protocols executed at the equipment manufacturer’s facility confirm that new assembly machinery meets operational and safety specifications before transport. The factory acceptance test evaluates mechanical functions, control systems, and safety interlocks against agreed engineering drawings. This verification prevents the shipment of defective machinery and reduces commissioning times at the battery plant.
Precommissioning Checklist
Running test materials through the equipment during assembly confirms that the mechanical sensors and actuators function correctly. For coating and slitting machines, a factory acceptance test verifies line speed and alignment accuracy before the machine is packed. These run tests use representative raw materials to simulate actual production conditions.
Discrepancies found during this phase are corrected by the vendor before shipment.
Equipment Handover
Completing the test protocols represents a contractual milestone that releases the final pre-shipment payment to the supplier. When the machine passes, the factory acceptance test documentation is signed by both parties to certify readiness for transport. This stage is necessary to establish the baseline performance for the subsequent site acceptance test.
Performance Guarantee
Quality metrics such as alignment tolerance and output rate must be demonstrated during the trials. This test phase of the factory acceptance test verifies that the machine meets the throughput requirements.